Battery Storage Fires: Myths, Facts, and What Actually Happens #355
About this episode
Battery energy storage fire safety is one of the most urgent permitting challenges facing solar and storage developers in 2026. Mike Nicholas, Energy Storage Specialist and Fire Consultant at Hiller Companies, brings a rare perspective: he built Kern County's entire BESS permitting program from scratch in 2019, when no national standards existed, and now travels the country helping developers, EPCs, and fire departments get these projects to yes.
Kern County has the highest concentration of renewable energy and battery storage in California, including the largest active battery storage project in the world at roughly 3.2 GWh. Mike developed a 32-page submission guideline that standardized the permitting process and became a model other jurisdictions are now replicating. After retiring as a fire captain and assistant fire marshal in 2024, he joined Hiller, which represented about 85% of the battery storage clients that went through Kern County permitting. He now works with the Governor's Office of Business and Economic Development and American Clean Power to build reference documents and videos for fire safety standardization.
Here is what you will learn in this conversation about battery energy storage fire safety:
- Find out why the Moss Landing disaster changed everything. A fire inside an enclosed former power plant building destroyed an estimated 240 megawatts. An outdoor containerized failure, under current standards, would be contained to the enclosure of origin, a fraction of 1% of that loss. You'll understand why the industry is moving hard toward outdoor containerized deployments.
- Learn what UL 9540A and the new large-scale fire testing (LSFT) requirement in NFPA 855 (2026) actually require, and why they matter to first responders. You'll hear why the test forces a fully populated unit into a worst-case thermal runaway with suppression disabled, and what it means for containing a fire within the enclosure of origin.
- Understand what a complete Hazard Mitigation Analysis must include. Find out why a generic OEM document will not pass, and what site-specific elements, from failure modes analysis to emergency response plans for construction, commissioning, and decommissioning, are required under NFPA 855.
- You'll hear Mike's step-by-step account of what should happen from the moment a fire alarm sounds to the moment the incident command is established. Learn why gas meters, IR cameras, and a fire alarm annunciator panel at the static water tank are critical tools for first responders who may be 15 to 20 minutes from the battery yard inside the site.
- Find out what developers and EPCs get wrong in permitting. Mike explains why early engagement with the fire department, before land use approval, is not optional, and why hiring a registered design professional who knows NFPA 855 is the difference between hitting your financing deadline and chasing it.
With BESS developers racing to lock in safe harbor and stay ahead of tightening FEOC and material-assistance thresholds, permitting delays and moratoria are a real threat to project timelines. Mike describes a shift already happening in California: under General Order 167-C, the California Public Utilities Commission now requires ESS operators to file emergency response plans and produce annual testing and maintenance reports, and Kern County has introduced an annual operational permit tied to emergency contact updates. These requirements are likely to spread nationally.
Connect with Mike Nicholas
Hiller Companies: https://hillerfire.com/
Connect with Tim
Clean Power Hour
Clean Power Hour on YouTube
Tim on Twitter
Tim on LinkedIn
Email [email protected]
Review Clean Power Hour on Apple Podcasts
The Clean Power Hour is produced by the Clean Power Consulting Group and created by Tim Montague. Contact us by email: [email protected]
Corporate sponsors who share our mission to speed the energy transition are invited to check out https://www.cleanpowerhour.com/support/
The Clean Power Hour is brought to you by CPS America, maker of North America’s number one 3-phase string inverter, with over 6GW shipped in the US. With a focus on commercial and utility-scale solar and energy storage, the company partners with customers to provide unparalleled performance and service. The CPS America product lineup includes 3-phase string inverters from 25kW to 275kW, exceptional data communication and controls, and energy storage solutions designed for seamless integration with CPS America systems. Learn more at www.chintpowersystems.com
Get every episode summarized
Each time Clean Power Hour publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.
Email me new episodesFree for 3 shows. No card needed.
Hosts & guests
No transcript yet
This episode has not been transcribed. Request it and it moves to the front of the queue.
More episodes
More from Clean Power Hour

How Do You Get 20 MW When the Utility Offers 7? #368
Clean Power Hour

Section 232 Is a Price Floor, Not a Tariff: Solar Module Prices Explained.
Clean Power Hour

Derek Hansen on what makes a solar company great, not just good #367
Clean Power Hour

What does it take to build solar that lasts 30+ years? #366
Clean Power Hour