Skip to content
TrackPodcasts
educationDec 22, 202318:08pending

BOILER ROOM PIPING

About this episode

This story was originally published on HackerNoon at: https://hackernoon.com/boiler-room-piping.
All surfaces should be painted before the covering is applied. Canvas is ordinarily placed over the covering, held in place by wrought-iron or brass bands.
Check more stories related to writing at: https://hackernoon.com/c/writing. You can also check exclusive content about #non-fiction, #engineering-and-technology, #hackernoon-books, #project-gutenberg, #books, #babcock-and-wilcox-company, #ebooks, #steam-its-generation-and-use, and more.

This story was written by: @bwco. Learn more about this writer by checking @bwco's about page, and for more stories, please visit hackernoon.com.

In the design of a steam plant, the piping system should receive the most careful consideration. Aside from the constructive details, good practice in which is fairly well established, the important factors are the size of the piping to be employed and the methods utilized in avoiding difficulties from the presence in the system of water of condensation and the means employed toward reducing radiation losses. Engineering opinion varies considerably on the question of material of pipes and fittings for different classes of work, and the following is offered simply as a suggestion of what constitutes good representative practice. All pipe should be of wrought iron or soft steel. Pipe at present is made in “standard”, “extra strong”[76] and “double extra strong” weights. Until recently, a fourth weight approximately 10 per cent lighter than standard and known as “Merchants” was built but the use of this pipe has largely gone out of practice. Pipe sizes, unless otherwise stated, are given in terms of nominal internal diameter. Table 62 gives the dimensions and some general data on standard and extra strong wrought-iron pipe.

Get every episode summarized

Each time Writing Tech Brief By HackerNoon publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.

Email me new episodes

Free for 3 shows. No card needed.

Hosts & guests

No transcript yet

This episode has not been transcribed. Request it and it moves to the front of the queue.

BOILER ROOM PIPING

Writing Tech Brief By HackerNoon

0:00
18:08

More episodes

More from Writing Tech Brief By HackerNoon

View all episodes →