Loading...
Loading...

The City will begin the 2026 Road Repair and Street Safety (RRSS) Project Phase 1 the week of April 27. The project will address numerous roads around the City and will include crack sealing, chip sealing, asphalt overlay, patching, curb, gutter, sidewalk, and pavement marking. The goal of the project is to update infrastructure for motorists, pedestrians, and cyclists. The public should expect intermittent traffic impacts, including short delays, and minor backups, on portions of the routes listed below. These impacts are expected throughout the project, which is scheduled to be completed in the fall of 2026. Woodlands Village Boulevard...
For the written story, read here >> https://www.signalsaz.com/articles/flagstaff-road-repair-project/
Check out the CAST11.com Website at: https://CAST11.com
Follow the CAST11 Podcast Network on Facebook at: https://Facebook.com/CAST11AZ
Follow Cast11 Instagram at: https://www.instagram.com/cast11_podcast_network
No transcript available for this episode.

SignalsAZ.com - Arizona News Podcast

SignalsAZ.com - Arizona News Podcast

SignalsAZ.com - Arizona News Podcast