
About this episode
We tour MARA’s Granbury flagship to show how a 260 MW Bitcoin mine runs quietly beside a natural gas plant and why 67% of rigs now sit in immersion. We break down modular build speed, behind‑the‑meter power, vertical integration, and load balancing with HPC.
• 260 MW flagship site with 12.2 EH contribution
• Immersion cooling adoption at 67% of active machines
• Modular container strategy for rapid energization
• Acoustic wall and gravel plan for noise and dust control
• On‑site repair workflow and visual monitoring software
• 20‑second curtailment capability for grid support
• Behind‑the‑meter access to natural gas power
• Vertical integration shift to ~70% owned facilities
• Mining and HPC complement for load balancing
• Local jobs and school robotics sponsorship
Hit the like button. Feel free to subscribe. Let us know if you have any questions for the team at Mara and what you thought of today's video.
Anthonys Info:
Website:
https://www.powermininganalysis.com
X:
https://twitter.com/cazenove_uk
Patreon:
https://www.patreon.com/Cazenove_UK
Bryce's Info:
X:
Patreon:
https://www.patreon.com/McNallieMoney
Merch:
https://shop.mcnalliemoney.com/
Website:
Business Inquiries:
Email - [email protected]
Get every episode summarized
Each time Power Analysis publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.
Email me new episodesFree for 3 shows. No card needed.
Hosts & guests
No transcript yet
This episode has not been transcribed. Request it and it moves to the front of the queue.
More episodes
More from Power Analysis

Crypto Clarity & AI Panic: Latest IREN, GLXY, BTDR & SLNH Stock News!
Power Analysis

AI Power Plays: Latest IREN, KEEL, BTBT & WULF Stock News!
Power Analysis

IREN Australia Update & Latest SLNH, HIVE, BTDR & CORZ Stock News!
Power Analysis

AI Infrastructure Market Pulse: GLXY Batch Zero, KEEL, SLNH, BTBT, HIVE, HUT & B...
Power Analysis