
Running Your Shop at 100% Capacity Is a Mistake | Lean Built - Manufacturing Freedom E125
About this episode
Jay and Andrew discuss real-world shop challenges like air quality, ventilation, coolant selection, and bandsaw blade performance. The conversation expands into capacity planning, why running at 100% utilization is a hidden liability, and how maintaining margin and flexibility allows shops to respond quickly when customers need help.
Along the way, they touch on safety systems that fail when alerts are too distant from the problem, lessons from catastrophic industrial accidents, and why local, thoughtful gestures like good donuts or quality coffee build stronger vendor and customer relationships than generic (or just plain bad) corporate gifts.
Get every episode summarized
Each time Lean Built: Manufacturing Freedom publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.
Email me new episodesFree for 3 shows. No card needed.
Hosts & guests
No transcript yet
This episode has not been transcribed. Request it and it moves to the front of the queue.
More episodes
More from Lean Built: Manufacturing Freedom

Don’t Automate Waste | Lean Built - Manufacturing Freedom E162
Lean Built: Manufacturing Freedom

When to Cut Your Losses in Business | Lean Built - Manufacturing Freedom E161
Lean Built: Manufacturing Freedom

When Automation Creates More Work | Lean Built - Manufacturing Freedom E160
Lean Built: Manufacturing Freedom

Your Shop Doesn’t Have to Be Clean to Be Lean | Lean Built - Manufacturing Freed...
Lean Built: Manufacturing Freedom