
About this episode
We've all worked on those technical projects that felt doomed from the start.
In this episode, we're joined by Eyvonne Sharp and Mike Bushong to dig into what actually derails technical projects, and why the root cause is usually people, not packets.
We unpack:
- Why 80–90% of project failures aren’t technical
- What “executive sponsorship” is supposed to mean (and why most teams never use it)
- The real reason timelines feel arbitrary: information asymmetry
- What “healthy escalation” looks like (and how to avoid the courtroom vibe)
- How to deliver bad news to leaders: few words, calm tone, clear next step, clear ask
- The leadership move that instantly lowers the temperature: removing blame
- Why informal networks matter, including a legendary security-incident save powered by… cheesecake
If you’ve ever felt stuck in status-call theater, pressured to keep the project's status green, or unsure how to talk to leadership when reality hits, this episode is your playbook.
Full show notes, transcript and links: https://artofnetworkengineering.com/episodes/why-projects-fail
For everything AONE: https://artofnetworkengineering.com/
Get every episode summarized
Each time The Art of Network Engineering publishes, we email you a written briefing from the transcript — the topics, who appeared, and any specific claims, with the ad reads skipped.
Email me new episodesFree for 3 shows. No card needed.
Hosts & guests
No transcript yet
This episode has not been transcribed. Request it and it moves to the front of the queue.
More episodes
More from The Art of Network Engineering

Stop Vibe Coding: Start Spec-Driven Development, with John Capobianco
The Art of Network Engineering

500 Hours of Foosball, 20 Hours on Your Career | Mike Bushong on Staying Valuabl...
The Art of Network Engineering

Cursor for Network Engineers? Meet Transit AI (Sponsored)
The Art of Network Engineering

whoami: Network Engineering's Identity Crisis
The Art of Network Engineering